Implement the project engineer responsibility system, set up a quality control department, and set up an incoming material inspection team, a CMM inspection team, and a shipping and dismantling inspection team. Effectively control quality and progress.
The company operates the IATF16949 quality management system, from quality planning, to process control, final product delivery and continuous improvement, and controls every link to effectively control product quality.
Plan and identify projects
Product Design and Development
Design Failure Mode Analysis DFMEA, Prototype Control Plan CP
Process Design and Development
Process Failure Mode Analysis PFMEA, Trial Production Control Plan CP
Trial production, product and process validation
Production Part Approval Procedure PPAP, Measurement System Analysis MSA, Statistical Process Control SPC, Production Control Plan CP
Mass production, feedback/assessment/corrective action
Statistical Process Control SPC (CPK≥1.33)